top of page

First ORRBI Reef Build

Our first oyster reef build was a success! Our volunteers, staff and partners from SCDNR worked tirelessly to transport over 400 bags of oyster shell to the Copper River / Page Island site. From there, the bags were unloaded from boats and arranged on the exposed mud bank in a line parallel to the waters-edge. The bags of shell were then reinforced with re-bar and necessary signage was erected to designate the site - as regulated by the Army Corps of Engineers. Big thanks to the many volunteers that made this reef build possible. We look forward to many more in the future!


Featured Posts
Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
bottom of page